RESPONSIBLE AGENCY NULP (National University "Lviv Polytechnic")
RESPONSIBLE FOR METADATA NULP (National University "Lviv Polytechnic")
CURRENT STATION CONFIGURATION muk200ukr_20230412.log
STATUS IN EPN included since 09-01-2022
LAST AVAILABLE DATA 22-04-2024
LAST RECEIVER TRIMBLE NETR9 (29-07-2021 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS+SBAS
LAST ANTENNA TRM55971.00/NONE (18-08-2008 to now)
INDIVIDUAL CALIBRATION(S) none
DATA ROUTINELY ANALYSED BY BEV, MUT, SUT, UPA, WUT

The RINEX 2 data are no more submitted to the EPN data centres since 20-09-2021.

RINEX V2.11 - GPS+GLO
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 212/2021 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 107/2024 78.57%
BEV 113/2024 100%
BKGE 113/2024 100%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 114/2024 (H) 100% 100%
BKGE 114/2024 (H) 100% 100%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures