RESPONSIBLE AGENCY DUT (Delft University of Technology)
RESPONSIBLE FOR METADATA DUT (Delft University of Technology)
CURRENT STATION CONFIGURATION dlf100nld_20230425.log
STATUS IN EPN included since 27-09-2015
LAST AVAILABLE DATA 24-04-2024
LAST RECEIVER TRIMBLE ALLOY (24-04-2023 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS+SBAS
LAST ANTENNA LEIAR25.R3/LEIT (15-04-2011 to now)
INDIVIDUAL CALIBRATION(S)
  • LEIAR25.R3/LEIT (SN: 10030006) from 2011-04-15 to now :
DATA ROUTINELY ANALYSED BY BKG, GFZ, LPT, ROB
INCLUSION IN OTHER NETWORK(S) IGS, EPOS

The RINEX 2 data are no more submitted to the EPN data centres since 01-03-2022.

RINEX V2.11 - GPS+GLO
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 059/2022 N/A
BEV 059/2022 N/A
BKGI 059/2022 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS+QZSS+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 109/2024 78.57%
BEV 115/2024 100%
BKGI 115/2024 100%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 116/2024 (O) 100% 97.62%
BKGI 116/2024 (O) 100% 100%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures